PROCESS
How we run a façade project
One team owns the job until the shed comes down and the sidewalk is restored.
A Banu project runs in five steps. We read the report and the building, scope each condition line by line, and plan protection and access. Then we make the repairs, with photo updates at key milestones, and close out the permits with DOB and the documentation with your QEWI. Who we are →
How we keep you informed
- A project lead you can reach from the first walk-through to close-out.
- Photo updates at key milestones.
- Changes in scope talked through and agreed with you before added work goes ahead.
- Your QEWI kept in the loop.
Questions about our process
Why do proposals for the same report look so different?
Usually because each contractor read the report differently. One may scope every condition while another covers half and plans to add the rest as changes, or assumes less hidden damage. Ask every contractor to scope the report line by line, using the report's own numbering, and to spell out how they'll handle conditions nobody can measure until the wall is open. Then you're comparing the same job.
What happens when you open the wall and find more damage?
It's expected, and the scope plans for it. Hidden conditions get their own lines, counted in units anyone can check: bricks replaced, linear feet of lintel, square feet of stone patch. When we find more, we document it, show your QEWI and agree on the change with you before the added work goes on.
Who will we actually talk to during the job?
A project lead assigned to your building. You can reach them directly while the work is going on.
What's in the close-out package?
A record of the repairs, marked on the elevations and keyed to your QEWI's report, plus before-and-after photos, permit sign-offs, warranties where they apply and maintenance notes for the next cycle.